Hotel Beverly Park

Hotel industry

Hotel air-conditioning with covered Airlan coolers and inertia tanks. Heat recovery chillers for producing sanitary hot water. Hot water production with an accumulation of 10,500 litres. Flow distribution system with a collector with seven pumps. Cascading De Dietrich boiler inside furniture suitable for exteriors. Dining room air-conditioning with UTA AIRLAN and 22 rooms and suites with duct fan-coils.